Our Methodology Smarter Design, Faster Delivery

We move beyond traditional construction to an industrialized manufacturing approach. Our framework targets a 10–20% reduction in delivery time and CAPEX.

Standardized Reference Designs

Technical Blueprint

We reject the inefficiency of bespoke designs. Our horizontal and vertical reference designs are 60–80% standardized, allowing for rapid replication while leaving flexibility for customization.

Modular Phasing

Consolidated MEP systems into auxiliary units, allowing for phased data hall expansion that grows with your compute needs.

Off-Site Manufacturing

Building critical components in fabrication yards to improve safety, quality, and speed.

Generative 4D Scheduling

Managing a gigawatt-scale project requires more than a calendar. We utilize generative scheduling tools that run thousands of iterations on 4D project models.

  • Optimization: Identifying optimal sequencing of workforce and equipment before ground is broken.
  • Speed: Improving delivery schedules by as much as 20% compared to traditional planning.

Collaborative Contracting

We believe in shared risk and shared reward. By integrating contractors and suppliers early, we align incentives through win–win schemes linked to operational milestones.

This approach has been proven to save 3–5% in CAPEX while improving safety and quality.